Category: -|-

-|-

VIP Movement Notification – Bedminster, NJ

21-23 MAR, 2025 Morristown/Bedminster, NJ 30/10 NMR – 17,999FT MSL   Specific instructions and restrictions are available at http://tfr.faa.gov once the NOTAM has been issued. *Depicted TFR data may not be a complete listing. Pilots should not use the information on this website for flight planning purposes. For the latest information, call your local Flight Service Station at 1-800-WX-BRIEF
-|-

Flight Advisory GPS Interference Testing – Patuxent River, MD

FLIGHT ADVISORY GPS INTERFERENCE TESTING PATUXENT RIVER (PAXRVR) 25-04 17 – 28 March Patuxent River, MD   The entire flight advisory may be accessed and downloaded at the following address:   https://www.faasafety.gov/files/notices/2025/Mar/PAXRVR_25-04_GPS_Flight_Advisory.pdf   Pilots are advised to check NOTAMs frequently for possible changes prior to operations in the area.   NOTAMs will be published at least 24 hours in advance of this event.
Flight Advisory GPS Interference Testing – Fort Stockton, TX
-|-

Flight Advisory GPS Interference Testing – Fort Stockton, TX

FLIGHT ADVISORY GPS INTERFERENCE TESTING FORT STOCKTON TEXAS (FTSTTX) 25-31 16 – 21 March Fort Stockton, TX   The entire flight advisory may be accessed and downloaded at the following address:   https://www.faasafety.gov/files/notices/2025/Mar/FTSTTX_25-31_GPS_Flight_Advisory.pdf   Pilots are advised to check NOTAMs frequently for possible changes prior to operations in the area.   NOTAMs will be published at least 24 hours in advance of this event.
-|-

Update: HNL Arrival and eqparture Procedures

Update:  We've received feedback that the HNL North Six Arrival procedure could result in a challenging turn from Base Leg to Final Approach for RWY 4L or 4R. While the following Notice as originally sent addresses the current situation, we want to emphasize that safety is always THE most important concern - nothing else comes close.  Accordingly, pilots should consider requesting an alternate arrival or offshore vectors and must be cognizant of all potential risk factors, especially current winds. This is particularly true if there is a tailwind on the base leg before making the turn to final approach.On the North
-|-

Flight Advisory GPS Interference Testing – Utah Test and Training Range, UT

FLIGHT ADVISORY GPS INTERFERENCE TESTING UTAH TEST AND TRAINING RANGE (UTTR) 25-01 10 – 14 March Utah Test and Training Range, UT   The entire flight advisory may be accessed and downloaded at the following address:   https://www.faasafety.gov/files/notices/2025/Mar/UTTR_25-01_GPS_Flight_Advisory.pdf   Pilots are advised to check NOTAMs frequently for possible changes prior to operations in the area.   NOTAMs will be published at least 24 hours in advance of this event.  
-|-

Bradley International Airport Runway Construction

KBDL runway construction project will start on 4/21 and end on 11/21/25.  There will be multiple phases as indicated below: Phase 1: 4/21-5/1/25.  RY 15/33 closed but available for taxi.  Taxiway S/D intersection closed. Runway 6/24 remains open.  Phase 2-6: 5/1-11/21/25. RY 6/24 closed.  Portions of taxiway C and E will close based on the specific phase.  Phase 4: 8/9-8/11, 8/16-8/18, 8/23-8/25, 9/6-9/8, 9/13-9/15, 10/4-10/6, 10/11-10/13, 10/18-10/20, 10/25-10/27.  Runways 15/33 and 6/24 closed for construction at the intersection nightly 0000L-0530L.  There are some rain dates, but these are the planned closures limited to the 5.5 hour block.  These are hard